Wallace 6th Street Bridge Water Main

An 8″ steel water main under the new 6th Street Bridge over the South Fork of the Coeur d’Alene River in Wallace, Idaho. Specified in fiberglass with aluminum jacketing, supplied in Dragon Jacket, and intact after two winters over the river.

Location
Wallace, ID
Installed by
Apollo Construction
Pipe
8″ heat-traced steel water main
In service
Since October 2024

Scope

  • 72 ft of straights with a 2″ thickness, sized to fit over the pipe and its heat trace
  • Saddle inserts in high-density 6 lb material at all 13 pipe hangers
  • Expansion joint covers
  • 45° elbow and flange covers
  • Separate valve, elbow and riser components for the air release

Results

  • Supplied in place of the specified fiberglass with aluminum jacketing
  • Installed by the bridge contractor’s own crew, with no insulation subcontractor
  • Hangers carry the pipe on high-density inserts without crushing the insulation
  • Air release insulated separately so it comes off without disturbing the main
  • Jacketing and banding intact in November 2026, after two winters over the river

The problem

The City of Wallace replaced its 6th Street Bridge over the South Fork of the Coeur d’Alene River in 2024. An 8″ steel water main hangs under the new deck on pipe hangers, over open water, through Silver Valley winters.

Welch Comer Engineers’ design called for 2″ of pre-molded fiberglass with heat trace, a vapor barrier jacket and aluminum jacketing, steel protection saddles at each support, insulated expansion joints, and a manual air release insulated separately from the main so it could be removed on its own.

The solution

Dragon Jacket was supplied through HD Fowler in place of the fiberglass and aluminum. Every component arrived prefabricated to the project drawings with a 2″ thickness and a bore sized to fit over the pipe and its heat trace: straights, 45° elbows, and flange and expansion joint covers. High-density 6 lb saddle inserts sit at all 13 hangers, so the hangers carry the pipe without crushing the insulation.

The air release got its own small valve, elbow and riser components, so it can come off without touching the main. Apollo Construction, the contractor building the bridge, installed the insulation with its own crew in October 2024. Back at the bridge in November 2026, after two winters over the river, the jacketing and banding are intact.

Photos

Wallace 6th Street Bridge Water Main installation photo 1 Wallace 6th Street Bridge Water Main installation photo 2 Wallace 6th Street Bridge Water Main installation photo 3
Dragon Jacket pipe insulation

Dragon Jacket pipe insulation

Prefabricated pipe insulation with a closed-cell core encapsulated in polyurea, made to fit each project’s pipe, valves and fittings. It installs by clamshelling and banding, with no insulation trade required.

Shorter timelines
Longer lifespan

Have a line with the same problem? Send us the pipe sizes, fittings and conditions, and we’ll tell you what it takes to fix it for good.